Trusted Since 1976

Lab & Medical Equipment Relocation

Precision moves for hospitals, clinics, research labs, diagnostics, and biotech. From -80°C freezers and biosafety cabinets to analyzers and imaging units—our trained team protects calibration, data integrity, and chain of custody while minimizing downtime.

Specialized Packing & Crating Climate-Controlled Options (2–8°C) Compliance: OSHA • DOT • EPA Decontamination Coordination
Add your Lab & Medical overview here (16:9)

Why choose Roadrunner for specialized relocations

Protect calibration & data

Shock, vibration, or improper handling can cause costly recalibration and data loss. We use anti-vibration packaging, custom crating, and securement plans.

Climate control when it matters

Temperature-sensitive materials can ride in climate-controlled transport with continuous monitoring (commonly 2–8 °C) and documented chain of custody.

Compliance & safety first

We coordinate required decontamination and follow OSHA, DOT, and EPA rules for hazardous classifications and labeling.

Who we serve

Hospitals & Clinics

Department moves and equipment transfers with minimal disruption to patient care.

University & Research Labs

Protect instruments, samples, and research continuity across campus or across town.

Diagnostics & Imaging

Analyzers, centrifuges, microscopes, benchtop imaging—planned to preserve calibration.

Biotech & Pharma

Secure, documented handling for materials, reagents, and cold-chain needs.

Typical equipment we relocate

  • Biological Safety Cabinets (BSCs) & fume hoods
  • Incubators, cryogenic tanks, -20° to -80°C freezers
  • Centrifuges, spectrophotometers, analyzers
  • Microscopes & precision balances
  • Cleanroom furniture, racks, casework
  • Ultrasound, X-ray & other benchtop imaging
  • Computers, servers, and data systems
  • Sample inventories & cold-chain parcels
  • Custom-crated sensitive or oversized devices
  • Department contents & admin areas

How our process works

1) Plan & Prepare

Detailed inventory • Roles & timeline • Risk assessment

  • Record makes, models, serials, and handling notes.
  • Align stakeholders (lab leads, facilities, IT, EH&S).
  • Define chain-of-custody and labeling conventions.

2) Pack & Transport

Custom crating • Anti-vibration • Climate-control options

  • Specialized materials and secure truck loading.
  • Cold-chain monitoring for sensitive contents.
  • Clear destination labeling by room/bench.

3) Compliance & Decon

OSHA • DOT • EPA • HAZMAT separation

  • Coordinate pre-move decontamination and certifications.
  • Proper documentation and placarding where required.
  • Secondary containment for regulated materials.

4) Arrival & Recommission

Verification • Re-certification • Downtime mitigation

  • Condition checks upon delivery.
  • Coordinate calibration and certifications (e.g., BSCs).
  • Staggered schedules to bring benches online smoothly.
Note: Many facilities require a “safe to move / decontaminated” certificate for BSCs, fume hoods, and large devices. Please coordinate with your EH&S team; we’ll align our schedule.

Pre-move checklist

  • Finalize inventory and room-to-room map.
  • Back up data from attached PCs/instruments.
  • Defrost & dry freezers; secure shelves & doors.
  • Drain lines; cap ports where applicable.
  • Tag power/network needs at destination.
  • Schedule decontamination & retain certificates.
  • Pre-label benches, racks, and casework.
  • Identify cold-chain items and monitoring method.
  • Set sequence for critical-path instruments.
  • Confirm building access, elevators, and loading.

Frequently Asked Questions

Yes. We offer climate-controlled options and can document chain of custody and temperature range (commonly 2–8 °C) during transit.
We coordinate according to OSHA/DOT/EPA rules. Regulated materials must be classified, separated by class, packaged in compliant secondary containment, and properly labeled prior to transport.
We build a bench-by-bench sequence, protect calibration with proper packing, and align arrival with your vendor’s re-certification schedule.
Yes—many devices require a “safe to move / decontaminated” certificate. We’ll align with your EH&S timeline so documents are ready before move day.

Need a precise plan for your lab or medical move?
Let’s map inventory, compliance, and cold-chain together and protect your timeline.